Reading the building before writing the task list
The first job in an older premises is identifying which materials are original and which arrived in a later fit-out. A polished timber stair, an unsealed sandstone threshold and a painted pressed-metal ceiling all behave differently from the vinyl and laminate that may sit two metres away. Writing floors and surfaces as a single line ignores the fact that one wrong product can mark a surface permanently in a single pass.
That reading is also what makes an inclusion honest. If a timber floor can only take a dry method and an occasional damp pass, then the scope should say that rather than promise a mopped shine it will never deliver. Setting the expectation at the start avoids the far worse conversation where somebody chases a result by escalating the product until the finish is damaged.
